Can I pay the balance after receiving accessories inspection report?
Can I pay the balance after receiving accessories inspection report
This is confirmed per style, because the answer depends on the fabric, the construction and the finish you choose.
Accessories span metal hardware, webbing, leather and knitted textiles, so the material decision is made per item rather than per category. Assembly is often the hard part: belts need consistent hole spacing, socks need shape retention, and small goods need clean edge finishing.
.
Labels, hangtags and packaging can carry your own branding so the goods arrive ready to sell.
If your launch date is fixed, work backwards from it and treat sampling, bulk and freight as three separate bookings.
Sizing is agreed inside one colourway, so a size run can follow your real sales curve.
Production checks happen at cutting, at sewing, at finishing and before packing.
Bulk production starts once the sample is approved in writing, not while the specification is still moving.
Inspection focuses on hardware function, colour consistency across small units and edge finishing rather than on fit.
Sampling typically takes 2–3 weeks, and bulk production for around 100 pieces typically takes about 3 weeks after sample approval, subject to project details and scheduling.
If you would like this applied to a specific style, share the reference and the volume you have in mind and we will answer directly.
The payment schedule, inspection arrangements and any balance release are set out in the contract and confirmed in the quotation before production begins.