What is your production lead time for shorts?
The fabric decision moves the date more than the sewing decision.
| Sourcing | Lead time before cutting | Risk |
|---|---|---|
| Stocked fabric | days | shade is whatever the lot is |
| Mill order | weeks | date is set by the mill, not the factory |
Mesh and twill come from different mills with different schedules, so two shorts in two fabrics can have two completely different dates even in the same order.
Rule of thumbFor a fixed date, take stocked fabric and accept the lot shade. If the shade must be exact, the date has to move, not the factory.