What does ODM product development include for a streetwear brand?
Define the scope of ODM development
ODM product development needs an agreed scope for the particular project. A reference garment or visual direction can start the discussion, but it does not establish which design work, patterns, artwork or samples are included.
Identify what is already decided and where support is needed: silhouette, fit, measurements, fabric direction, construction, decoration or finishing. Ask the quotation to identify the proposed deliverables, fees, revision arrangements and items outside that scope.
Sampling is quoted individually based on the fabric, production techniques and any performance-fabric requirements. Sampling typically takes 2–3 weeks. Discuss exclusivity and access to development files separately; neither should be assumed from the term ODM.
Related resources: ODM product development and product development capabilities.
Practical points to confirm before you commit
Production runs on a confirmed specification. The standard minimum is 100 pieces per style, per color, with sizes mixable inside a color; smaller trial runs can be discussed case by case depending on the style and construction. Sampling is quoted per style and typically takes two to three weeks, and bulk production for around 100 pieces usually runs about three weeks after sample approval, depending on the requirements and the factory schedule at that moment. Sampling fees are quoted separately and can only be offset against bulk when the bulk volume is large enough, which is confirmed at quotation rather than assumed. International shipping is arranged by sea, air, or land according to the order, and both OEM and ODM development are supported from our Dongguan facility, which has more than 20 years of apparel production experience. Details that vary by order, such as payment terms, revision rounds, inspection arrangements, and rights over patterns or artwork, are set out in the quotation and the contract for that specific order.

